As the old entry building of the D’Ieteren site in Erps-Kwerps had become obsolete, it was replaced in 2017 by a new construction. The entries were refurbished as well.
Thanks to the pure volume, the clear-cut lines and the beautifully integrated identification, the ensemble is visually coherent and has a clear appearance to the users of the site.
The Edicule is organized on two levels. The office of the access controllers is on the ground floor, and the second floor houses a number of common functions: kitchenette, cloakrooms and toilets. It offers a covered bicycle parking at the back of the building.
During the works, the new building was built behind the old one. Hence, the construction and demolition phases could be managed optimally. Moving the access control activities was done in one go, from the old to the new building, without any interruption of the access to the site.
Data and credits
- Programme: Entry building and signalization of the site.
- Architect: D’Ieteren Immo
- Surface: 78 m²
- Year: 2017

Kronos Porsche Centre Louvain La Neuve
In order to better accommodate the commercial activities of Kronos Porsche, D'Ieteren Immo started the construction of a new garage in the spring of 2018. The smooth construction works were completed with a festive opening in March 2019.

Contact Center Volkswagen
2019 was not only the year for the design of a new Volkswagen logo. It was also the year in which the facade of the Contact Center Volkswagen was profoundly refurbished.